Complete new broadcast network and office refurbishment. An electrical and communications upgrade to an existing 6 storey building was undertaken on a floor by floor basis to enable occupation and utilisation during the construction process. All switchboards were upgraded to meet the specified requirements and a complete UPS system was integrated. The existing onsite generators were upgraded and a Copper10 data network was installed throughout the entire facility. The entire project was completed within 40 weeks.